Skip to content
Dongguan, China · Factory directENWhatsApp +86 177 2797 6041
OEM Jewelry Lab
Menu
Getting started · Updated August 30, 2026

What happens between approving a CAD and receiving the goods?

An OEM jewelry order runs in eight stages, of which only the first three can be reversed without cost. Knowing which stage an order is in — and which document should be in your hands before it closes — is what separates an order that arrives as specified from one that arrives as interpreted.

01

The eight stages

OEM jewelry production stages, durations and outputs
StageDurationOutputReversible?
01 · Manufacturability review≤ 24 hWritten notes on wall thickness, undercuts, post diameter and finish conflictsYes
02 · Quotation1–2 daysMetal, labour, coating, finishing and packing priced as separate lines; tooling quoted separatelyYes
03 · CAD sign-offYour decisionA dimensioned drawing with tolerances, approved in writingLast free change
04 · Tooling2–20 daysMold or die, cut against the signed drawingNo — cost committed
05 · Sampling10 daysA physical piece in the production material and finishChanges now cost tooling time
06 · Production25 daysIn-line QC during the run rather than only at the endNo
07 · InspectionBefore packingAQL report against the standard named in the purchase orderThe lot can be held
08 · Packing and shipmentBy incotermPacking list, commercial invoice, HS code, inspection and test reportsn/a

Review, quotation, sampling and production durations are ours. Tooling depends on the mold type — 2–4 days for silicone, 10–20 for a progressive steel die — and stamping dies are cut in our own wire EDM room rather than queued at an outside die shop, which is what keeps a revision inside days.

02

What you should be holding at the end of each stage

Every dispute on a production order is really a dispute about which of two remembered versions was agreed. The documents below cost nothing to ask for at the time and are unobtainable afterwards.

Document to hold at each stage and what it prevents
After stageDocumentWhat it prevents later
QuotationItemised quote with tooling on a separate lineAmortised tooling reappearing inside the unit price on every reorder
CAD sign-offA dated, dimensioned drawing with tolerancesArguing about dimensions against a render that has none
ToolingA written statement of who owns the toolingPaying a second time to move the design to another supplier
SamplingAn approved physical sample, one retained on each sideA finish dispute with no reference object to hold it against
ProductionThe plating or coating specification in micronsThickness quietly reduced to hit a target price
InspectionAQL report naming the standard, the level and the defect counts"Strict QC" turning out to mean nothing on arrival
ShipmentPacking list, invoice, HS code, and test reports where requiredCustoms delay, or duty assessed against the wrong heading

The full pre-production version of this list — specification, commercial terms, quality and compliance — is in the first order checklist.

03

What can run in parallel, and what cannot

The calendar in the first section is 40–58 days before freight, and most attempts to compress it target the wrong stage. Sampling and production are where buyers try to save time, and both are exactly where lost time is cheap compared with what skipping them costs.

Genuinely parallel with tooling and sampling:

  • Packaging development — boxes, pouches, cards, inserts
  • Label, barcode and care-card artwork
  • Booking the compliance laboratory and agreeing who pays for which batches
  • Appointing a freight forwarder and settling the incoterm
  • Photography planning against the approved sample

Strictly sequential, and no schedule survives pretending otherwise:

  • A die cannot be cut before the drawing is signed — it is cut against the drawing
  • A coating colour cannot be approved before a sample exists in the production material, because the same colour reads differently on steel, brass and silver
  • A plating or coating batch runs one colour at a time, which is why MOQ is counted per colour
  • Stone setting cannot begin before the castings or blanks are finished and polished
  • An AQL inspection cannot be performed on a lot that is already packed and sealed

The largest real saving available is booking compliance testing while tooling is being cut, rather than after inspection. It removes 1–3 weeks from the critical path and costs nothing but a decision made earlier.

04

Where orders actually go wrong

Failure mode by stage and the cost of catching it late
StageFailure modeCost of catching it late
Manufacturability reviewWall thickness below the process minimumTooling reworked — days plus the cost of the die
QuotationCoating quoted as "18k gold plated" with no micron figureVisually identical pieces that diverge after weeks of wear
CAD sign-offApproved from a render instead of a dimensioned drawingA whole run out of tolerance, argued about after arrival
SamplingSample skipped to save ten daysThe first physical object anyone sees is the 500th piece
ProductionSize or length distribution never statedThe correct total quantity in an unsellable mix
InspectionAQL agreed as a word rather than a numberNo agreed basis on which to reject the lot
ShipmentFindings sourced outside the tested batchA compliant body on a clasp or post that fails testing

Six of these seven are settled before any metal moves. Defect classes, inspection stages and remedies cover the seventh.

05

How the sequence changes for ODM and private label

The eight stages above describe OEM production from your own design. Two other routes run a different number of stages, and the difference is mostly in how much happens before tooling.

ODM inserts a development stage between the brief and the quotation: concepts, then CAD developed to your price point. It adds 5–10 days and one clause — who owns the resulting design, and for how long it is exclusive to you. Private label deletes stages 03 to 05 outright. Nothing is tooled because everything is already tooled, so the sequence is selection, quotation, a branding sample, and production.

Stage count and first-delivery calendar by route
RouteStagesTo first deliveryTooling cost
OEM — your design86–9 weeks + freightPer style
ODM — developed from your brief97–10 weeks + freightPer style
Private label — already tooled44–5 weeks + freightNone

Calendars exclude freight and assume no sample revision. Air freight adds 5–10 days, sea 25–40.

06

Questions on this

Each answer stands alone and can be read without the rest of the article.

How long does a full OEM jewelry order take?

6–9 weeks from signed CAD to goods ready, before freight: up to 24 hours for the manufacturability review, 1–2 days to quote, 2–20 days of tooling depending on mold type, 10 days sampling and 25 days production, then inspection and packing. Air freight adds 5–10 days and sea 25–40. Each sample revision adds a further 5–10 days, which is the most common reason a quoted calendar and an actual one differ.

Can tooling start before the CAD is signed off?

No, and it should not. A mold or die is cut against a specific dimensioned drawing, so starting before sign-off means cutting steel against a design that can still change — and the cost of that change lands on whoever authorised the early start. Sign-off is the last point at which a change is free, which is exactly why it deserves a dimensioned drawing rather than an approving email against a render.

Who owns the mold or die after it is paid for?

Whatever the purchase order says, which is why it needs to say something. Buyer-owned tooling means no second tooling charge on a reorder and the ability to move the design elsewhere; supplier-owned tooling means neither. This is a one-line clause at quotation stage and an expensive negotiation once the tooling exists and the design sells.

Can I change the design after seeing the sample?

Yes, but the cost depends on the size of the change. Surface finish, plating colour and packaging can change without touching the tooling. Dimensions, wall thickness or geometry mean the mold is modified or recut, which costs part or all of the original tooling fee and adds 2–20 days. Cosmetic changes cost days; geometric changes cost the die.

Why does each plating colour need its own production batch?

A plating or coating batch runs a single colour at a time — the bath chemistry or chamber target is set for that colour and changing it means a full changeover. That is the mechanical reason MOQ is counted per style per plating colour rather than per style: three colours of one design is three batches, not one batch of mixed goods.

What does a physical sample tell you that a CAD render does not?

Weight, balance, surface quality, clasp tension, how the coating colour actually reads on the production alloy, and how the piece sits on a body. A render is geometry with a material assigned to it; none of those properties exist in it. It is also the only reference object available if the production run later has to be judged against what was approved.

Not answered here? All buyer questions →

Sources

Where the standards and legal limits quoted above are published, so a reader can check them at the issuer rather than taking this article's word.

Put this into a quotation

Send the design, the material and the quantity. You get an itemised price with the tooling separated out, the plating specified in microns, and the compliance route for your market.

  1. 01Reply within one working day, Guangdong business hours.
  2. 02Itemised cost sheet — mold quoted separately, not folded into the unit price.
  3. 03NDA on request before any file is shared.

.stl .3dm .step .ai .pdf .jpg .png — up to 5 MB

Or email support@oemjewelrylab.com directly. We reply to every inquiry with a number, not a brochure.

Chat on WhatsApp